Kingston Technology FURY Beast 128GB 5600MT/s DDR5 CL36 DIMM (Kit of 2) RGB
☆☆☆☆☆
(0 reviews)
Lowest price (incl. delivery)
8 811,00 PLN
Typical price8 876,75 PLN
Lowest (90 days)8 792,00 PLN
Offers2
Last updated4 days ago
Price history (90 days)
Full history
2026-07-23
2026-08-14
| Updated At | Price |
|---|---|
| 2026-07-23 | 8 984,55 |
| 2026-07-26 | 8 997,50 |
| 2026-08-05 | 8 879,97 |
| 2026-08-08 | 8 799,00 |
| 2026-08-09 | 8 807,48 |
| 2026-08-14 | 8 792,00 |
| Seller | Product price | Delivery | Total | Availability | Updated | |
|---|---|---|---|---|---|---|
| AL Allegro.pl (PL) | 8 792,00 PLN | 19,00 PLN | 8 811,00 PLN | Available | 10 hours ago | View offer |
| BA Back to the Office | 1 917,99 GBP | 19,00 GBP | 1 936,99 GBP | Limited | 3 weeks ago | View offer |
Prices and availability may change. Last Updated: 14.08.2026 08:59.
EAN
740617350272
Kingston Technology
0,0
☆☆☆☆☆
0 reviews
5★
0%
4★
0%
3★
0%
2★
0%
1★
0%
Product reviews
No reviews yet — be the first!
Enhanced RGB lighting with new heat spreader design* Patented Kingston FURY Infrared Sync Technology™ Intel® XMP 3.0 certified AMD EXPO certified Qualified by the world’s leading motherboard manufacturers** Improved stability for overclocking Kingston FURY™ Beast DDR5 RGB Memory - up to 6800MT/sKingston FURY™ Beast DDR5 RGB delivers speeds of up to 6800MT/s. Featuring Infrared Sync Technology™ to keep the vibrant customisable lighting in perfect sync, available with sleek black or white heat spreaders and support for Intel® XMP 3.0 and AMD EXPO™, it’s 100% speed tested and backed by a limited lifetime warranty.Kingston FURY™ Beast DDR5 RGB* lets you overclock in style on next-gen gaming platforms with cutting-edge technology. Experience the superior speed advancements of DDR5 with double the banks and double the burst length.Vibrant RGB lighting customisable with Kingston FURY CTRL software and patented Infrared Sync TechnologyTM, along with the new heat spreader designs in black or white, sets you apart in and out of the game.Kingston FURY Beast DDR5 RGB features Intel XMP 3.0 or AMD EXPO options, two new DDR5 overclock specs that include customisable profiles for speeds and timings. 100% tested at speed and backed by a limited lifetime warranty.Enhanced lighting with new heat spreader designGame in style by customising the black or white heat spreaders with the smooth, stunning range of 18 RGB lighting* effects using Kingston FURY CTRL™ or the motherboard manufacturer’s software.Patented Kingston FURY Infrared Sync Technology™Vibrant RGB effects light in unison with Kingston’s patented Infrared Sync Technology.Intel® XMP 3.0 certifiedAdvanced pre-optimised timings, speed and voltage for overclocking performance and save new user-customisable profiles using a programmable PMIC.AMD EXPO certifiedAMD EXPO (Extended Profiles for Overclocking) Certified modules include Intel XMP 3.0 profiles, enabling compatibility with the platform of your choice.Qualified by the world’s leading motherboard manufacturers**Tested and trusted for your preferred motherboard so you can build with confidence.Improved stability for overclockingOn-die ECC (ODECC) helps maintain data integrity to sustain ultimate performance Features Buffered memory type Unregistered (unbuffered) Internal memory 128 GB Memory layout (modules x size) 2 x 64 GB Internal memory type DDR5 Component for PC Memory form factor 288-pin DIMM ECC No On-Die ECC Yes CAS latency 36 Memory data transfer rate 5600 MT/s Memory voltage 1.25 V SPD profile Yes Country of origin China, Taiwan Cooling type Heatsink Backlight Yes Lead plating Gold Backlight colour Red/Green/Blue Operational conditions Operating temperature (T-T) 0 - 85 °C Storage temperature (T-T) -55 - 100 °C General Product series Beast Product family FURY Weight & dimensions Width 7.1 mm Depth 133.4 mm Height 42.2 mm Weight 32.6 g Packaging data Package width 121.9 mm Package depth 14 mm Package height 171.5 mm Package weight 133.1 g Unleashing DDR5 performance
Similar products
Katun 44436 toner cartridge 1 pc(s) Magenta
from $80.00
HP EliteDesk 8 Mini G1i AI Intel Core Ultra 9 64 GB DDR5-SDRAM 1 TB SSD Windows 11 Pro Mini PC AI PC Black
from $3,352.79
Katun 44437 toner cartridge 1 pc(s) Yellow
from $80.00
DELL Pro Max 18 Plus MB18250 Intel Core Ultra 9 285HX Mobile workstation 45.7 cm (18") Quad HD+ 64 GB DDR5-SDRAM 1 TB SSD NVIDIA RTX PRO 3000
from $7,312.65
HP ZBook Fury G1i Intel Core Ultra 9 285HX Mobile workstation 40.6 cm (16") WUXGA 32 GB DDR5-SDRAM 1 TB SSD NVIDIA RTX PRO 3000 Blackwell Wi-Fi 7
from $7,043.41
Kolink OBSERVATORY HF MW computer case Midi Tower White
from $45.71